Water Supplies Update

Water Update 06 04

Milder temperatures and rainfall over recent weeks has seen a considerable drop in required production levels, compared to just over a month ago, at all 8 Shire water supplies.

Quirindi’s supply, the Borambil bore field, improved significantly during March. (see graph)

The dry weather experienced in January and February caused elevated evaporation from Quipolly Dam which saw the capacity level drop to 85.7%. Over the last month there has been a slight increase in level due to rainfall over the dam. Unfortunately, there was no flow in Quipolly Creek.

Work continues on the upgrade to the Caroona water supply. Drilling work has been completed on the new bore hole.

Level P (Permanent) water conservation measures are currently in force at all 8 of the Shire’s water supplies. Level P means consumers are requested to minimise watering during the heat of the day, high pressure houses only should be used to wash down hard/paved surfaces and pool covers should be used to reduce evaporation. Be water conscious and smart at all times.

Opening Hours

Mon to Fri: 8.30AM - 5.00PM

Sat to Sun: Closed

Public Holidays: Closed

 

Physical Address

60 Station Street

Quirindi NSW

2343

 

Postal Address

PO Box 152

Quirindi NSW

2343

Contact Details

Phone: 02 6746 1755

Fax: 02 6746 3255

Email: lpsc@lpsc.nsw.gov.au